E-Fuels Strategy Advisory: Getting Power-to-Liquid (PtL) Projects to FID
Trident Renewables provides e-fuels strategy advisory to investors, fuel suppliers and airlines deciding whether to commit capital or sign offtake for a Power-to-Liquid project. We test the four contracts a lender reads at final investment decision: power, CO2, offtake and the technology wrap.
CURRENT CALL
Our current call on Power-to-Liquid sits on the homepage: House View HV-04 →
SHEET 02 · DEFINITION
What Is Power-to-Liquid (PtL), and Why Do So Few Projects Reach FID?
Power-to-Liquid (PtL) makes liquid fuels such as e-SAF, e-diesel and e-methanol from renewable hydrogen and captured CO2. Few projects reach FID because a mandate creates an obligation to buy, which is different from a contract a lender can finance, and because electricity price drives the cost of every litre.
Electrolysis turns power into hydrogen. Methanol synthesis combines that hydrogen with CO2 directly. Fischer-Tropsch needs the CO2 converted to carbon monoxide first, by reverse water-gas shift or co-electrolysis, and its output is then upgraded to jet and diesel. The ICCT's 2022 study of e-kerosene costs in the US and Europe names electricity price and CO2 price as the two main cost drivers. That is why the power contract is the first document we read.
Selling hydrogen or ammonia without converting it to fuel? See our green hydrogen due diligence.
SHEET 03 · MANDATES
Why E-SAF Mandates Have Not Produced Bankable Offtake
ReFuelEU Aviation requires synthetic aviation fuel to average 1.2% of fuel supplied at EU airports across 2030 and 2031, rising to 35% by 2050. The obligation sits with fuel suppliers. A supplier that falls short pays a penalty of at least twice the price gap between synthetic fuel and conventional jet for each tonne missed, and still owes the missing volume the following year. (Orrick, October 2026)
Airlines hesitate to sign long contracts at today's prices when later plants should be cheaper. The obligated supplier faces a different sum. If it misses its share, it pays the penalty and still has to buy the volume the following year. Its cost of not contracting is the penalty plus a later purchase, which gives it a reason to buy early and puts a defined ceiling on what compliance is worth to it.
That is the offtake we look for: a contract with an obligated fuel supplier, priced by reference to the penalty, with a floor that covers debt service.
Mandate background and airline procurement are covered on our SAF consulting page. Gaurav Shah set out why e-SAF struggles to reach FID in European Business Magazine.
SHEET 04 · FOUR CONTRACTS
The Four Contracts a PtL Project Needs Before FID
Across the e-fuels value chain, a PtL project is financed on four contracts. If one is missing, or runs shorter than the debt, the financing does not close. We review each contract against the other three, because the failure usually sits in the gap between two of them.
01 · Power
For power bought under a PPA, the EU rules for renewable fuels of non-biological origin (RFNBO), set in Delegated Regulation (EU) 2023/1184, decide whether the hydrogen counts. The additionality test requires the generator to have started operating no more than 36 months before the electrolyser. Plants in operation before 1 January 2028 are exempt from that test until 2038. Plants that start later must meet it from day one. Production must match renewable output by calendar month until 31 December 2029 and by the hour from 1 January 2030, and member states may bring hourly matching forward to July 2027. The generator must sit in the same bidding zone as the electrolyser, or in an interconnected zone with an equal or higher power price.
What breaks it: a construction slip past the end of 2027 moves the plant into the stricter rules, and a power contract signed for the old schedule may no longer qualify.
02 · CO2
Captured CO2 counts only if its source is accepted under the RFNBO emissions methodology in Delegated Regulation (EU) 2023/1185. CO2 from direct air capture, or from biofuels and biomass that meet the EU sustainability criteria, carries no end date. CO2 captured at EU ETS installations counts only if it is built into fuel before 2036 when it comes from power generation, or before 2041 when it comes from other industrial activity.
What breaks it: a fossil CO2 source whose eligibility ends before the debt is repaid, or a CO2 contract shorter than the fuel offtake.
03 · Offtake
The offtake should be signed with an obligated fuel supplier, priced by reference to the ReFuelEU penalty, with a price floor and a tenor that matches the debt. Splitting volume across aviation, marine and chemical buyers reduces risk only when each buyer's scheme accepts the same molecule and certification.
What breaks it: a price set on a voluntary green premium, or a contract that ends before the loan does.
04 · Technology wrap
Different vendors usually guarantee the electrolyser and the synthesis unit. Lenders need one guarantee on the integrated plant's output, or a clear answer on who pays when the two units do not run well together.
What breaks it: two clean vendor warranties and nobody responsible for the plant's actual yield.
TENOR TEST · EACH CONTRACT MUST RUN AT LEAST AS LONG AS THE DEBT
DEBT
POWER
CO2
OFFTAKE
TECHNOLOGY WRAP
SHEET 05 · CREDITS
Credit Stacking Across the US and EU
PtL revenue can depend as much on credits as on fuel value, and each regime pays under its own rules.
In the US, the Section 45Z clean fuel production credit covers fuel produced after 31 December 2024 and sold before 1 January 2030. Under the proposed regulations of February 2026, the credit is paid per gallon and scaled by the fuel's emissions rate, and hydrogen inputs follow rules similar to Section 45V. The proposed rules do not settle whether captured CO2 and hydrogen count as feedstock under the North American sourcing requirement, so we model 45Z as a scenario until the final rules do. California's Low Carbon Fuel Standard (LCFS) pays a separate credit tied to carbon intensity.
In the EU, RED III sets a 1% RFNBO sub-target in transport energy for 2030, and counts RFNBOs at 1.5 times their energy content in aviation and maritime. ReFuelEU adds the aviation obligation above.
A US plant exporting e-SAF to Europe has to decide which regime receives each gallon, and the certification behind each claim has to match it. The question we put to every model: which regime pays for this molecule, and is that payment contracted or assumed?
SHEET 06 · OPERATOR CHECK
What an Operator Checks That a Financial Model Misses
Financial models treat a PtL plant as one conversion efficiency. Plants lose output at the joints between units. We test the subsystems that decide uptime: gas compression, heat integration, product separation and hydrotreatment of the synthetic crude.
The second check is operating rhythm. Electrolysers can follow variable renewable output, while Fischer-Tropsch and methanol synthesis reactors want steady feed. The hydrogen buffer, storage and turndown range that bridge the two are where yield is lost and where capex estimates most often come in light.
Managing Partner Gaurav Shah's operating record covers 20+ renewable energy plants, including industrial biofuel plants he built and ran in the US. Trident carried out full techno-commercial validation of a $250M+ e-fuels investment for a sovereign wealth fund ahead of its commitment decision. For the plant-level technical diligence scope, see our e-fuels consulting and PtL due diligence page.
SHEET 07 · QUESTIONS
Frequently Asked Questions
Why do Power-to-Liquid projects fail at FID?
Most fail on their contracts. The chemistry usually works. The offtake is priced on a voluntary premium, the power contract stops qualifying after a schedule slip, the CO2 supply ends before the debt does, or nobody guarantees the integrated plant's yield. Lenders read all four contracts together, and one gap stops the financing.
How should an e-SAF offtake be priced?
Price it against the ReFuelEU penalty. A supplier that misses its synthetic share pays at least twice the price gap to conventional jet and still owes the volume the next year. A contract with an obligated supplier, referenced to that penalty with a floor covering debt service, gives lenders revenue they can underwrite.
What should a US PtL model assume about Section 45Z?
Model 45Z as a scenario with a fixed end date. The credit covers fuel sold before 1 January 2030 and pays per gallon, scaled by the fuel's emissions rate. The February 2026 proposed rules leave open whether captured CO2 and hydrogen meet the North American feedstock rule, so keep the credit out of base-case debt.
What do the RFNBO rules require of a project's power supply?
For PPA power, plants entering operation from 1 January 2028 must contract renewable generation that started no more than 36 months before the electrolyser. Output must match it by calendar month until the end of 2029, then hourly, within the electrolyser's bidding zone or an interconnected zone priced equal or higher.
Should a PtL project sell only to aviation?
Aviation carries the strongest EU obligation, so it anchors most PtL offtakes. Selling part of the output as e-methanol or e-diesel to shipping or chemical buyers can lower volume risk, provided each buyer's scheme accepts the same molecule and certification. Flexibility the certifications do not support adds nothing a lender will count.
SHEET 08 · ENGAGEMENT
Send Us the Project and the Decision You Face
Share the project location, electrolyser capacity, power and CO2 arrangements, offtake status and your decision date. One call usually shows whether the four contracts can close.